TotalEnergies Port Arthur is a facility operated by TotalEnergies in TX. The facility operates 2 process units including Ethylene Cracker, Polyethylene. ExecGraph estimates the installed equipment base at $108M across 6 line items.
TotalEnergies Port Arthur equipment inventory begins with 2 verified process units.
| Unit Name | Capacity |
|---|---|
| Ethylene Cracker | — |
| Polyethylene | — |
TotalEnergies Port Arthur installed equipment population modeled across 6 categories with $108M total estimated value. Annual MRO spend is estimated at $6M with $11M in turnaround scope value.
| Equipment Category | Count |
|---|---|
| Heat Exchanger | 8 |
| Compressor | 3 |
| Isolation Valve | 300 |
| Control Valve | 40 |
| Relief Valve | 60 |
| Gasket Packing | 80 |
TotalEnergies Port Arthur is a facility operated by TotalEnergies in TX. The facility operates 2 process units including Ethylene Cracker, Polyethylene. ExecGraph estimates the installed equipment base at $108M across 6 line items.
TotalEnergies Port Arthur operates 2 verified process units including Ethylene Cracker, Polyethylene. The facility is operated by TotalEnergies.
ExecGraph estimates $108M in total installed equipment value at TotalEnergies Port Arthur, across 6 calculated line items covering 6 equipment categories. This includes $6M in annual MRO spend and $11M in turnaround scope value.
TotalEnergies Port Arthur is operated by TotalEnergies, TX. ExecGraph tracks procurement, maintenance, and operations intelligence for this facility.
No turnaround events are currently tracked for TotalEnergies Port Arthur. ExecGraph continuously monitors Gulf Coast facility schedules.
Starter $99/mo. Track procurement leads, reliability engineers, and turnaround planners at TotalEnergies.
START FREE TRIAL