Facility Turnaround Schedule

Exxonmobil Beaumont Turnaround Schedule

4 turnaround events tracked at this facility. 4 confirmed, 0 projected from cycle analysis.

4
Events
4
Confirmed
3
Unit Types

Scheduled Turnarounds

Delayed Coker
COKER
confirmed
Schedule
May 1, 2026 June 15, 2026 (45 days)
Source
Company guidance
Verified
May 7, 2026
Coker drum overhaul including coke drum inspection, unheading valve replacement, and derrick maintenance. ~60K bpd.
Fluid Catalytic Cracker
FCC
confirmed
Schedule
December 1, 2026 January 15, 2027 (45 days)
Source
Company guidance + trade press
Verified
May 7, 2026
Full FCC turnaround including reactor, regenerator, and fractionator overhaul. ~120K bpd unit offline.
Hydrotreater #1
HYDROTREATER
confirmed
Schedule
December 1, 2026 December 28, 2026 (28 days)
Source
Inferred from FCC schedule
Verified
May 7, 2026
Hydrotreater catalyst changeout synchronized with FCC shutdown window.
Hydrotreater #2
HYDROTREATER
confirmed
Schedule
December 1, 2026 December 28, 2026 (28 days)
Source
Inferred from FCC schedule
Verified
May 7, 2026
Second hydrotreater catalyst changeout during FCC window.