Facility Turnaround Schedule

Exxonmobil Beaumont Turnaround Schedule

About This Facility

Exxonmobil Beaumont is a facility operated by ExxonMobil in Golden Triangle, TX. The facility operates 4 process units including Delayed Coker, Hydrotreater #1, Hydrotreater #2.

4 turnaround events tracked at this facility. 4 confirmed and 0 classified probable or possible.

4
Events
4
Confirmed
3
Unit Types

Scheduled Turnarounds

Delayed Coker
COKER
confirmed
Schedule
May 1, 2026 to June 15, 2026 (45 days)
Source
Company guidance
Last Verified
May 7, 2026
Coker drum overhaul including coke drum inspection, unheading valve replacement, and derrick maintenance. ~60K bpd.
Hydrotreater #1
HYDROTREATER
confirmed
Schedule
December 1, 2026 to December 28, 2026 (28 days)
Source
Inferred from FCC schedule
Last Verified
May 7, 2026
Hydrotreater catalyst changeout synchronized with FCC shutdown window.
Hydrotreater #2
HYDROTREATER
confirmed
Schedule
December 1, 2026 to December 28, 2026 (28 days)
Source
Inferred from FCC schedule
Last Verified
May 7, 2026
Second hydrotreater catalyst changeout during FCC window.
Fluid Catalytic Cracker
FCC
confirmed
Schedule
December 1, 2026 to January 15, 2027 (45 days)
Source
Company guidance + trade press
Last Verified
May 7, 2026
Full FCC turnaround including reactor, regenerator, and fractionator overhaul. ~120K bpd unit offline.

Related

Explore

Related

Frequently Asked

Frequently Asked Questions about Exxonmobil Beaumont turnarounds

When is the next turnaround at Exxonmobil Beaumont?

ExecGraph tracks 4 turnaround events at Exxonmobil Beaumont. 4 are confirmed. The remaining records are classified probable or possible based on the available evidence. Review each source and last-verification date before treating a schedule as committed.

Who operates Exxonmobil Beaumont?

Exxonmobil Beaumont is operated by ExxonMobil. Review the operator and facility records separately because role and site assignments can change.

How do I sell to Exxonmobil Beaumont during a turnaround?

Use confirmed or probable planning signals to identify the active scope-development window. Then map the turnaround, maintenance, reliability, procurement, operations, and safety functions associated with ExxonMobil.

What other facilities have turnarounds in Golden Triangle?

View the Golden Triangle market schedule to compare record-level confidence, source dates, and overlapping outage windows across facilities.

Review the pursuit window and buying center

Use confirmed and probable records to prioritize research, then verify the operator, source, date, and decision chain before acting.

REQUEST A WALKTHROUGH