Valero Port Arthur Refinery is a refinery operated by Valero Energy in Golden Triangle, TX. The facility has a crude processing capacity of 380,000 bpd. The facility operates 7 process units including Crude Distillation, FCC, Delayed Coker. ExecGraph estimates the installed equipment base at $40M across 25 line items.
Valero Port Arthur Refinery equipment inventory begins with 7 verified process units. Total crude distillation capacity is 380k barrels per day.
| Unit Name | Capacity |
|---|---|
| Crude Distillation | 380k bpd |
| FCC | 75k bpd |
| Delayed Coker | 158k bpd |
| Catalytic Reformer | 58k bpd |
| Hydrotreater | 346k bpd |
| Alkylation | 20k bpd |
| Sulfur Recovery (SRU) | — |
Valero Port Arthur Refinery installed equipment population modeled across 6 categories with $40M total estimated value. Annual MRO spend is estimated at $4M with $12M in turnaround scope value.
| Equipment Category | Count |
|---|---|
| Control Valve | 591 |
| Isolation Valve | 2,009 |
| Pump | 75 |
| Relief Valve | 270 |
| Compressor | 1 |
| Pipe Fitting | 16 |
Valero Port Arthur Refinery is a refinery operated by Valero Energy in Golden Triangle, TX. The facility has a crude processing capacity of 380,000 bpd. The facility operates 7 process units including Crude Distillation, FCC, Delayed Coker. ExecGraph estimates the installed equipment base at $40M across 25 line items.
Valero Port Arthur Refinery operates 7 verified process units including Crude Distillation, FCC, Delayed Coker, Catalytic Reformer and more. The facility is operated by Valero Energy.
ExecGraph estimates $40M in total installed equipment value at Valero Port Arthur Refinery, across 25 calculated line items covering 6 equipment categories. This includes $4M in annual MRO spend and $12M in turnaround scope value.
Valero Port Arthur Refinery is operated by Valero Energy in the Golden Triangle market, TX. ExecGraph tracks procurement, maintenance, and operations intelligence for this facility.
ExecGraph tracks 1 turnaround events at Valero Port Arthur Refinery. View the facility turnaround schedule for confirmed dates, projected windows, and scope detail.
Starter $99/mo. Track procurement leads, reliability engineers, and turnaround planners at Valero Energy.
START FREE TRIAL