Shell Norco Refinery Equipment Intelligence

Shell Norco Refinery operated by Shell with $135M in estimated installed equipment across 7 process units and 31 calculated line items.

7
Process Units
$135M
Est. Equipment Value
31
Calculated Line Items

Process Units at Shell Norco Refinery

Shell Norco Refinery equipment inventory begins with 7 verified process units. Total crude distillation capacity is 232k barrels per day.

Unit NameCapacity
Crude Distillation232k bpd
FCC119k bpd
Delayed Coker29k bpd
Catalytic Reformer40k bpd
Hydrotreater189k bpd
Alkylation18k bpd
Sulfur Recovery (SRU)

Installed Equipment by Category

Shell Norco Refinery installed equipment population modeled across 7 categories with $135M total estimated value. Annual MRO spend is estimated at $13M with $39M in turnaround scope value.

Equipment CategoryCount
Isolation Valve3,521
Control Valve856
Heat Exchanger95
Relief Valve459
Pump47
Compressor3
Pipe Fitting4

Equipment by Process Unit

Hydrotreater
$104M6 line items
Fcc
$14M7 line items
Crude Unit
$12M4 line items
Alkylation Hf
$3M4 line items
Delayed Coker
$1M10 line items
Capital & Replacement Summary
Total Installed Value
$135M
Annual MRO Estimate
$13M
Turnaround Scope Value
$39M